ATTENTION ALL RESIDENTS!
Front doors are scheduled to be repainted July 15th – 31st .
Please remove decorations and anything that prevents full repainting of the door.
Four hours needed for two coats of paint with door left partially open for drying.
Sign Up to Schedule When Your Front Door Can Be Repainted! |
PHASE 1: Buildings 1 to 4 (3298 Noel 3290 to Noel, 3281 Beaverbrook to 3317 Beaverbrook, 9231 Cameron),
https://calendly.com/vallekarla0224/door-painting
PHASE 2: Buildings 5 to 8 (9181 Cameron to 9229 Cameron, 3302 Noel to 3322 Noel).
https://calendly.com/vallekarla0224/door-painting-building-5-8
PHASE 3: Courtyard – Buildings 9 to 12 (#130 – 3288 Noel to #158 – 3288 Noel).
https://calendly.com/d/cp6d-p7x-pkp/door-painting-coutyard
If you do not have online access to sign up yourself,
contact Gary W. (President) or Ed B. (New Projects)
to get you on the door repainting schedule in time!